Vertical Projects

LIST OF IMPLEMENTED VERTICAL INFRASTRUCTURE PROJECTS
NO PROJECT TITLE / LOCATION SOURCE OF FUNDS APPROPRIATION CONTRACT
        PRICE
1 CREATION OF ACCESSWAY FROM   DONOR AIP 2008                        300,000.00                            287,518.71
  ROOM TO THE BLOOD BANK LABORATORY      
  CONSTRUCTION OF A CONCRETE STAND FOR      
  THE REFIGERATED CENTRIFUGE      
  (RED CROSS) HARIZON ROAD      
         
2 REPLACEMENT OF THE HOG CORRAL CAPITAL OUTLAY 2007                          500,000.00                          480,000.00
  ROOFING & DOG POUND      
  SLAUGHTERHOUSE COMPOUND      
         
3 CONSTRUCTION OF POLICE OUTPOST LDF 2008                          150,000.00                          145,380.00
  AT PUROK 2      
  DPS COMPOUND      
         
4 REPAIR AND MAINTENANCE OF BARANGAY FUND                            70,120.00                            69,885.00
  BARANGAY HALL      
  IRISAN      
         
5 CONSTRUCTION OF DAY CARE CENTER LDF 2007 & 2008                        320,000.00                          309,764.00
  AT KADAKLAN VILLAGE      
  LOAKAN-APUGAN      
         
6 ENCLOSURE AND IMPROVEMENT BARANGAY FUND                        350,000.00                          349,443.00
  OF DAY CARE CENTER      
  LUCNAB      
         
7 IMPROVEMENT OF THE BARANGAY BARANGAY FUND                          158,800.00                          153,900.00
  HALL      
  SALUD MITRA      
         
8 EXTRA WORK ORDER NO. 1 FOR THE CITY ORD. NO. 41, S. 2009                        525,649.58                          525,649.58
  RESTORATION OF THE BURNT AREA      
  CITY MARKET      
         
9 IMPROVEMENT OF BARANGAY HALL BARANGAY FUND                          140,818.00                          139,222.80
  KABAYANIHAN      
         
10 IMPROVEMENT OF BARANGAY SK FUND 2009                          199,547.35                            191,635.20
  BASKETBALL COURT      
  HILLSIDE      
         
11 COMPLETION OF BARANGAY HALL BARANGAY FUND                        300,000.00                          290,900.00
  BASEMENT      
  ABCR      
         
12 CONTINUATION OF THE CONSTRUCTION CAPITAL OUTLAY                      2,000,000.00                      1,668,300.00
  OF MINOR DETENTION CENTER      
  KAYANG STREET      
         
13 IMPROVEMENT OF BARANGAY HALL BARANGAY FUND                          150,000.00                          145,450.00
  FOR SK OFFICE (PHASE I)       
  UPPER DAGSIAN      
         
14 EXTENSION OF THE OLD BARANGAY BARANGAY FUND                          302,008.10                          301,900.00
  HALL AND COSNTRUCTION OF      
  BARANGAY MARKER      
  VICTORIA VILLAGE      
         
15 IMPROVEMENT OF BARANGAY HALL BARANGAY FUND                          192,572.76                          190,077.60
  EAST MODERNSITE AURORA HILL      
         
16 BARANGAY OUTPOST BARANGAY IRA                          126,923.26                          123,000.00
  HILLSIDE      
         
17 CONSTRUCTION OF THE BARANGAY FUND                      2,382,631.57                      2,379,800.90
  MULTI-PURPOSE BARANGAY HALL      
  HILLSIDE      
         
18 IMPROVEMENT OF BARANGAY HALL BARANGAY IRA                            70,800.00                            68,666.00
  FOR S.K. OFFICE (PHASE II)      
  UPPER DAGSIAN      
         
19 CONSTRUCTION OF TANOD'S OUTPOST BARANGAY FUND                          237,341.20                            195,018.80
  BESIDE MULTI-PURPOSE HALL 2005-2008    
  SAN LUIS VILLAGE      
         
20 CONSTRUCTION OF KITCHEN FOR DAY LDF 2008                          150,000.00                          145,450.00
  CARE CENTER      
  SALUD MITRA      
         
21 IMPROVEMENT OF BARANGAY HALL BARANGAY FUND                            50,000.00                            49,940.00
  CONSTRUCTION OF COMFORT ROOM      
  UPPER DAGSIAN      
         
22 CONSTRUCTION OF SK OFFICE BARANGAY FUND                          150,000.00                          149,950.00
  FAIRVIEW (SK FUND 2009)    
         
NO PROJECT TITLE / LOCATION SOURCE OF FUNDS APPROPRIATION CONTRACT
      ABC PRICE
23 IMPROVEMENT OF SANGGUNIANG BARANGAY FUND                            28,000.00                              28,000.00
  KABATAAN OFFICE, PHASE III - FLOOR      
  TOPPING AND TILE WORKS OF      
  COMFORT ROOM      
  IMELDA VILLAGE      
         
24 CONSTRUCTION OF ROOFING OF BARANGAY FUND 2009                          150,000.00                          148,626.00
  CHILDRENS PLAYGROUND      
  LOWER LOURDES SUBDIVISION      
         
25 CONTINUATION OF DAY CARE CENTER LDF 2008                          150,000.00                          144,774.60
  AT PUROK 4      
  GIBRALTAR (EAST UPPER)      
         
26 REPAIR OF SEWERAGE SYSTEM C.O. 811                          133,506.12                          133,400.00
  FIRE STATION      
         
27 CONSTRUCTION OF PEDESTRIAN LDF 2004 & 2008 3,000,000.00                      2,764,500.32
  OVERPASS      
  CITY HALL-POLICE STATION      
         
  CONSTRUCTION OF PEDESTRIAN LDF 2004 & 2008 56,970.14                            56,970.14
  OVERPASS (EXTRA WORK NO. 1)      
  RELOCATION OF HERO'S CORNER      
  CITY HALL-POLICE STATION      
         
  CONSTRUCTION OF PEDESTRIAN LDF 2004 & 2008 86,011.75                              86,011.75
  OVERPASS (EXTRA WORK NO. 2)      
  CONSTRUCTION OF PAVEMENT      
  CITY HALL-POLICE STATION      
         
28 PROPOSED CONSTRUCTION OF CAPITAL OUTLAY 2003, 2004, 2007                      4,000,000.00                      3,877,000.00
  VETERINARY OFFICE      
  SLAUGHTER COMPOUND      
         
29 COBNSTRUCTION OF A CONCRETE, LDF 2005                          351,933.20                          340,014.67
  REINFORCED RETAINING WALL OF THE      
  EXCAVATED SITE OF THE AHBCSCA CENTER      
  AURORA HILL      
         
30 CONSTRUCTION OF SATELLITE LDF 2003, 2005, 2006,                        348,375.00                          348,102.37
  MARKET      
  UPPER DAGSIAN      
         
31 IMPROVEMENT OF MULTI-PURPOSE LDF 2006                        700,000.00                          677,751.59
  BUILDING      
  LUCBAN ELEM SCHOOL      
         
32 CONSTRUCTION OF COVERED BARANGAY FUND 2009                          193,518.86                          193,427.82
  COURT      
  SAN VICENTE      
         
33 IMPROVEMENT REPAIR OF BARANGAY BARANGAY FUND                          142,645.00                          142,432.00
  HALL (2007 SUPP/2009 ANNUAL BUDGET)    
  EAST QUIRINO HILL      
         
34 CONSTRUCTION OF ADDITIONAL LDF 2009                          125,000.00                          124,760.00
  CLASSROOMS AT IRISAN NATIONAL      
  HIGH SCHOOL      
  IRISAN BRGY      
         
35 EXTENSION OF MULTI-PURPOSE HALL BARANGAY FUND                          254,871.00                          254,870.00
  FAIRVIEW      
         
36 CONSTRUCTION OF DAY CARE CENTER BARANGAY FUND                          500,160.38                          500,100.00
  PHASE IV      
  SOUTH SANITARY CAMP      
         
37 IMPROVEMENT OF SECOND FLOOR BARANGAY FUND 2009                            158,401.91                          158,340.00
  OF THE BARANGAY HALL      
  LUALHATI BRGY      
         
38 CONSTRUCTION OF DAY CARE CENTER BARANGAY FUND                          131,759.00                            131,705.00
  PHASE II      
  LUALHATI      
         
39 IMPROVEMENT OF THE DAY CARE BARANGAY FUND                          269,693.51                          269,600.00
  CENTER      
  LUALHATI      
         
40 REPAIR OF DILAPIDATED ROOF AND BARANGAY FUND 2009                            60,800.00                            60,750.00
  GUTTER OF THE BARANGAY HALL      
  SALUD MITRA      
         
41 IMPROVEMENT OF SCHOOL PREMISES LDF 2009                        200,000.00                          199,950.00
  AT DOÑA AURORA ELEMENTARY      
  SCHOOL      
         
42 REPAIR OF COVERED COURT ROOFING BARANGAY FUND 2010                          129,513.38                          129,500.00
  AND FENCE      
  MIDDLE QUIRINO HILL      
         
NO PROJECT TITLE / LOCATION SOURCE OF FUNDS APPROPRIATION CONTRACT
      ABC PRICE
43 IMPROVEMENT OF THE BARANGAY LDF 2007                          120,000.00                            119,002.00
  DAY CARE & LIVELIHOOD CENTER      
  IMELDA MARCOS      
         
44 EXTENSION AND REHABILITATION BARANGAY IRA                          673,941.27                          652,662.85
  OF BARANGAY HALL      
  UPPER GENERAL LUNA      
         
45 CONSTRUCTION OF SK OFFICE BARANGAY FUND                        458,000.00                          457,014.00
  PHASE II      
  GIBRALTAR      
         
46 RESTORATION OF THE BURNT AREA CITY ORD. NO. 41 S. 2009                      2,686,658.02                      2,658,640.88
  PHASE II (CANOPY)      
  CITY MARKET      
         
47 CONSTRUCTION OF GATE AND ROOFING BARANGAY FUND                          173,707.50                          172,984.00
  OF THE ENTRANCE AND TERRACE      
  OF THE BARANGAY HALL      
  DONTOGAN      
         
48 IMPROVEMENT OF DAY CARE BARANGAY FUND 2009                          100,000.00                            99,640.00
  CENTER 1      
  DONTOGAN      
         
49 DEVELOPMENT OF SATELLITE MARKET LDF 2003, 2004, 2007                  38,200,000.00                      11,894,838.62
  MINES VIEW      
  see C-1155      
         
50 ENCLOSURE OF THE LOWER GROUND BARANGAY IRA                          311,633.80                          309,713.40
  FLOOR OF THE NEWLY DAY CARE      
  CENTER QUEZON HILL PROPER      
         
51 IMPROVEMENT OF BARANGAY BARANGAY IRA                            88,000.00                            85,355.00
  HALL (PHASE III) UPPER DAGSIAN      
         
52 CONTINUATION OF THE CONSTRUCTION LDF 2009                            70,000.00                            69,000.00
  OF BARANGAY HALL LOPEZ JAENA      
         
53 IMPROVEMENT OF NEW MULTI-PURPOSE LDF 2009                        200,000.00                          199,500.00
  BUILDING (COMPLETION OF SK OFFICE I)      
  SAN LUIS VILLAGE      
         
54 CONSTRUCTION OF SATELLITE MARKET LDF 2007                            50,000.00                            47,827.00
  AT 1ST FLOOR OF THE MULTI-PURPOSE      
  LOPEZ JAENA      
         
55 CONSTRUCTION OF A KITCHEN AND BARANGAY IRA                        375,959.40                          373,673.60
  RESTROOM AT THE BARANGAY HALL      
  LOWER GENERAL LUNA      
         
56 UPGRADING OF DAY CARE CENTER BARANGAY FUND 2009                        200,000.00                          199,970.93
  BALACBAC STO TOMAS PROPER      
         
57 IMPROVEMENT OF BARANGAY HALL LDF 2007                        400,000.00                          387,012.93
  AND DAY CARE CENTER      
  ATOK TRAIL      
         
58 IMPROVEMENT OF BARANGAY HALL LDF 2007                          120,000.00                            115,500.00
  LOAKAN PROPER      
         
59 COMPLETION OF CITY VETERINARY 2007 CONTINUING APPROPRIATION                      1,000,000.00                          984,240.00
  OFFICE SLAUGHTER COMPOUND      
         
60 COMPLETION OF TANOD OUTPOST BARANGAY IRA 2009                          100,000.00                          100,000.00
  LUCNAB      
         
61 CONSTRUCTION OF COMFORT ROOMS LDF 2009                          100,000.00                            99,758.40
  AT DOÑA NICASIA ELEMENTARY      
  SCHOOL EAST MODERNSITE      
         
62 IMPROVEMENT OF BARANGAY HALL BARANGAY FUND 2008                          349,081.00                          348,670.00
  NORTH SANITARY CAMP BARANGAY FUND 2009    
    BARANGAY FUND 2010    
         
63 EXTENSION OF DAY CARE CENTER BARANGAY FUND                        275,463.76                          275,324.61
  UPPER ROCK QUARRY      
         
64 CONSTRUCTION OF PHASE II OF THE LDF 2008                          100,000.00                            97,722.75
  BASKETBALL COURT      
  QUEZON HILL PROPER      
         
65 IMPROVEMENT OF BARANGAY HALL BARANGAY FUND 2010                          139,000.00                          138,900.00
  PHASE IV      
  UPPER DAGSIAN      
         
66 ROOFING OF THE BAGUIO CITY JAIL CAPITAL OUTLAY                          150,000.00                            65,957.16
  MAIN ENTRANCE AND THE ENTRANCE      
  OF DISPLAY ROOM      
  ABANAO ST      
         
NO PROJECTS SOURCE OF FUNDS APPROPRIATION CONTRACT
      ABC PRICE
67 CONSTRUCTION OF WAITING SHED LDF 2004                          100,000.00                            91,208.00
  INTERSECTION OF TACAY AND SILVER      
  STREET      
  UPPER QUEZON HILL      
         
68 IMPROVEMENT OF DAY CARE CENTER LDF 2008                            50,000.00                            49,500.00
  PLAYGROUND      
  MIDDLE QUIRINO HILL      
         
69 IMPROVEMENT OF MULTI-PURPOSE LDF 2006                        800,000.00                          770,000.00
A HALL      
  CAMDAS      
         
69 IMPROVEMENT OF MULTI-PURPOSE LDF 2006                            61,235.23                            61,235.23
B HALL (EXTRA WORK ORDER)      
  CAMDAS      
         
70 IMPROVEMENT OF BARANGAY HALL BARANGAY IRA 2010                        309,007.40                          308,919.60
  IMELDA VILLAGE      
         
71 REPAIR/REHABILITATION OF ALL LDF 2008                      4,000,000.00                      3,878,499.66
  EXISTING WAITING SHEDS      
  CITY WIDE      
         
72 COMPLETION OF HOLYGHOST BARANGAY FUND 2006                        367,973.00                          367,451.00
  PROPER MULTI-PURPOSE HALL SK FUND 2009    
  HOLYGHOST PROPER      
         
73 IMPROVEMENT OF STAIRS/STEPS AND BARANGAY IRA 2008                          133,180.60                            129,150.00
  CONSTRUCTION OF SHADED ALLEY AT      
  PUROK 4      
  SOUTH CENTRAL AURORA HILL      
         
74 REPAIR OF TREASURY AND PLANNING LDF 2008                      3,100,000.00                      2,850,000.00
  OFFICER      
  CITY HALL      
         
  REPAIR OF TREASURY AND PLANNING LDF 2008 241,052.26 241,052.26
  OFFICER (extra work order I)      
  CITY HALL      
         
75 DEVELOPMENT AND FENCING OF LDF 2007                          100,000.00                            95,307.00
  EAST BAYAN BASKETBALL HALF      
  COURT      
  EAST BAYAN PARK      
         
76 REHABILITATION OF MAGSAYSAY PDAF 2007                      1,000,000.00                          866,748.79
  ELEMENTARY SCHOOL (DISTRICT III)      
  NEW LUCBAN      
         
77 CONTINUATION OF CONSTRUCTION BARANGAY FUND 2008 & 2009                        520,000.00                          504,300.00
  OF BARANGAY HALL      
  CAMP ALLEN      
         
78 IMPROVEMENT OF STALLS AT LDF 2007 & 2008                          175,000.00                          169,740.00
  BARANGAY SATELLITE MARKET      
  LOWER ROCK QUARRY      
         
79 CONSTRUCTION OF ADDITIONAL LDF 2008                          150,000.00                          149,000.00
  CLASSROOM FOR GRADE VI      
  SAN LUIS PRIMARY SCHOOL      
         
80 CONSTRUCTION OF JOINT BARANGAY BARANGAY FUND                        622,207.00                          621,707.00
  HALL AT FERDINAND BARANGAY &      
  IMELDA MARCOS BARANGAY      
         
81 IMPROVEMENT OF BARANGAY HALL BARANGAY FUND 2009                        244,465.00                          228,324.00
  MIDDLE QUIRINO HILL      
         
82 REPAIR/IMPROVEMENT OF COMFORT OFFICE BUDGET 2009                        950,000.00                          796,558.83
  ROOMS      
  BCPO      
         
83 PROPOSED WAITING SHED BARANGAY IRA 2009                          100,000.00                            99,883.75
  LUCNAB      
         
84 IMPROVEMENT OF MULTI-PURPOSE BARANGAY IRA 2007/2008                        265,208.00                          264,500.00
  BUILDING      
  MINES VIEW      
         
85 REPAIR OF SOCIAL DEVELOPMENT CAPITAL OUTLAY                      1,000,000.00                          942,163.25
  CENTER      
  IRISAN BRGY      
         
86 REPLACEMENT OF EXISTING SPIRAL LDF 2008                          115,000.00                            114,394.00
  STAIRWAY AND REPLACEMENT OF BARANGAY FUND    
  EXISTING WOODEN DOORS TO STEEL      
  DOORS OF BARANGAY HALL      
  ALFONSO TABORA      
         
NO PROJECTS SOURCE OF FUNDS APPROPRIATION CONTRACT
        PRICE
87 REPAIR OF COA BODEGA MOOE                          200,771.91                          200,000.00
  MOTORPOOL      
         
88 CONSTRUCTION OF WAITING SHED LDF 2009                          150,000.00                          149,820.00
  AT 2ND CAVE      
  CRYSTAL CAVE, BAKAKENG      
         
89 REPAIRS AT THE FOR FUNDING                              99,114.92                            99,000.00
  CITY SLAUGHTERHOUSE      
         
90 PLASTERING OF EXTERNAL WALLS OF BARANGAY FUND                            55,002.54                            55,000.00
  THE BARANGAY HALL AND      
  REHABILITATION OF THE DOWNSPOUT      
  LUALHATI      
         
91 CONSTRUCTION OF COMFORT ROOMS BARANGAY FUND 2010                        237,263.68                          237,200.00
  AND DRESSING ROOM INCLUDING SUPPLEMENTAL    
  SEPTIC TANK AT BASKETBALL COURT      
  SCOUT BARRIO      
         
92 CONTINUATION OF THE CONSTRUCTION CAPITAL OUTLAY                      1,000,000.00                          992,313.56
  OF MINOR DETENTION CENTER      
  KAYANG STREET      
         
93 IMPROVEMENT OF TWO DAY CARE LDF 2007                        200,000.00                          186,864.00
  CENTERS      
  MIDDLE QUIRINO HILL      
         
94 IMPROVEMENT OF BARANGAY HALL BARANGAY FUND                        338,349.00                          302,000.00
  EAST BAYAN PARK      
         
95 CONTINUATION OF CONSTRUCTION BARANGAY FUND 2010                        227,796.00                          227,643.35
  OF MULTI-PURPOSE DAY CARE CENTER      
  (BALACBAC)      
  STO TOMAS PROPER      
         
96 CONSTRUCTION OF TALIPAPA/ LDF 2006                          100,000.00                            99,941.59
  SATELLITE MARKET ALONG CHROME      
  STREET      
  UPPER QUEZON HILL      
         
97 IMPROVEMENT OF BARANGAY HALL/ SK FUND PRIOR YEARS/                        552,847.23                          551,348.96
  DAY CARE CENTER/SK OFFICE BARANGAY IRA FUND 2010    
  NORTH SANITARY CAMP      
         
98 INSTALLATION OF TOILET FIXTURES LDF 2010                            95,000.00                            94,700.00
  AT CITY HALL DAY CARE CENTER      
  CITY HALL      
         
99 IMPROVEMENT OF DOG POUND CAPITAL OUTLAY 2009                          100,000.00                            99,800.00
  SLAUGHTER COMPOUND      
         
100 IMPROVEMENT OF THE MULTI-PURPOSE BARANGAY FUND 2009                        253,000.00                          252,000.00
  BARANGAY HALL      
  LOAKAN-LIWANAG      
         
101 REPLACEMENT OF AWNING WINDOW ACCOUNT CODE 711                            41,490.88                            41,285.00
  TO SLIDING WINDOW AND      
  REPLACEMENT OF DOOR @ MITD,      
         
         
102 CONSTRUCTION OF MEZZANINE FLOOR MOOE 811                        225,047.58                          224,035.00
  PESO, CITY HALL      
         
103 RENOVATION OF THE PROPOSED CONTINUING                            52,008.35                            51,408.00
  MITD OFFICE AT DILG OFFICE PHASE II      
  CITY HALL      
         
104 IMPROVEMENT OF CBAO RECORDS CAPITAL OUTLAY 2008                      1,000,000.00                          971,960.00
  SECTION      
  DPS COMPOUND (CBAO)      
         
105 COMPLETION OF LUCBAN HEALTH CAPITAL OUTLAY 2006                      1,800,000.00                        1,400,107.31
  CENTER      
  NEW LUCBAN      
         
106 CONSTRUCTION OF ADDITIONAL LDF 2009                      2,500,000.00                      2,200,581.83
  CLASSROOM AT KIAS ELEMENTARY      
  KIAS      
         
107 INSTALLATION OF FLOOR TILES AT THE CAPITAL OUTLAY                        500,000.00                          237,025.12
  BAGUIO CITY JAIL POST 1 TO 5 ALLEY      
  AND AT THE FEMALE DORM ALLEY      
  BAGUIO CITY JAIL      
         
108 PROPOSED GUARD HOUSE AT BUSOL LDF 2006                          150,000.00                            148,162.66
  FOREST RESERVATION AND      
  WATERSHED      
  AURORA HILL      
         
NO PROJECTS SOURCE OF FUNDS APPROPRIATION CONTRACT
        PRICE
109 CONTINUATION OF REHABILITATION OF THE CAPITAL OUTLAY                          150,000.00                          149,487.47
  BAGUIO CITY JAIL KITCHEN AREA (PHASE II)      
  BJMP      
         
110 CONTINUATION OF BARANGAY HALL BARANGAY FUND                        535,653.00                          535,039.62
  CONSTRUCTION      
  CAMPO SIOCO (IMELDA & FERDINAND)      
         
111 CONTINUATION OF BARANGAY HALL BARANGAY FUND                          345,108.12                          343,602.61
  CONSTRUCTION      
  CAMPO SIOCO (IMELDA & FERDINAND)      
         
112 REPAIR OF ONE COMFORT ROOM LDF 2009                            59,000.00                            58,665.00
  AT DONTOGAN ELEMENTARY SCHOOL      
  DONTOGAN      
         
113 CONTINUATION OF HEALTH CENTER BARANGAY FUND                          210,000.00                          209,754.95
  AT PUROK 6      
  GIBRALTAR      
         
114 CONTINUING FINISHING OF BARANGAY BARANGAY FUND                          155,873.00                          155,665.00
  HALL      
  LUALHATI      
         
115 CONTINUATION OF EXTENSION OF BARANGAY FUND                          120,974.90                            120,915.03
  BARANGAY HALL & DAY CARE CENTER (SK SUPPLEMENTAL 2008 & 2009)    
  UPPER MARKET      
         
116 CONSTRUCTION OF DAY CARE CENTER LDF 2005                      1,000,000.00                          999,781.40
  PINGET      
         
117 SENIOR CITIZENS BUILDING AT LDF 2009                          100,000.00                            95,000.00
  SLAUGHTER COMPOUND (PHASE I)      
         
118 IMPROVEMENT OF THE BASEMENT BARANGAY FUND                              54,610.71                              54,610.71
  OF THE BARANGAY HALL      
  EAST BAYAN PARK      
         
119 CONSTRUCTION/REHABILITATION LDF 2009                          100,000.00                            99,480.00
  OF DILAPIDATED WAITING SHED      
  SUNNYSIDE FAIRVIEW      
         
120 CONTINUATION OF EXTENSION OF DAY LDF 2007                        220,000.00                          202,802.00
  CARE CENTER Ord. No. 21 s. 2009    
  PUCSUSAN Ord. No. 24 s. 2009    
         
121 CONSTRUCTION OF ROOF AT GSO CAPITAL OUTLAY                          140,662.18                          239,480.00
a AND CONSTRUCTION OF ACCESS TO      
  WATER TANKS      
  CITY HALL      
         
  CONSTRUCTION OF ROOF AT GSO CAPITAL OUTLAY                            65,000.00                            59,970.00
b AND CONSTRUCTION OF ACCESS TO      
  WATER TANKS (CONTINUATION)      
  CITY HALL      
         
122 CONCRETING OF FLOORING OF BARANGAY FUND                        300,000.00                          298,643.16
  2ND FLOOR      
  LOAKAN PROPER      
         
123 MARKET DEVELOPMENT LDF 2009                    18,500,000.00                    15,585,872.24
  (BLOCK 3)      
  BAGUIO CITY PUBLIC MARKET      
         
124 REHABILITATION OF SCOUT BARRIO CAPITAL OUTLAY 2008                      1,000,000.00                          989,715.95
  HEALTH CENTER      
  SCOUT BARRIO      
         
125 IMPROVEMENT OF BARANGAY HALL LDF 2006                        200,000.00                            192,812.10
  NORTH CENTRAL AURORA HILL      
         
126 REPAIR/IMPROVEMENT OF BCPO 2010 BUDGET                        500,000.00                          378,387.00
  DOWNSPOUTS AND ROOF      
  BAGUIO CITY POLICE OFFICE      
         
127 REHABILITATION OF COMFORT ROOM BARANGAY IRA 2009-2010                        270,000.00                          270,000.00
  AT THE FLEA MARKET      
  SLAUGHTER COMPOUND      
         
128 IMPROVEMENT OF CAMP 7 LDF 2010                            50,000.00                            49,544.00
  ELEMENTARY SCHOOL MINI PARK      
  CAMP 7      
         
129 CONTINUATION OF THE CONSTRUCTION BARANGAY FUND                          337,551.22                            336,431.18
  OF THE STAGE AND REHABILITATION      
  OF THE BASKETBALL COURT      
  KIAS      
         
130 IMPROVEMENT OF BARANGAY STAGE LDF 2009                          100,000.00                            99,950.00
  ENGINEER'S HILL      
         
NO PROJECTS SOURCE OF FUNDS APPROPRIATION CONTRACT
        PRICE
131 IMPROVEMENT OF BARANGAY HALL BARANGAY FUND 2010                            80,284.00                            75,600.00
  EAST BAYAN PARK      
         
132 CONSTRUCTION OF IRISAN HEALTH CAPITAL OUTLAY                      2,500,000.00                        2,152,263.71
  CENTER AT PUROK 15      
  IRISAN      
         
133 IMPROVEMENT OF QUEZON HILL CAPITAL OUTLAY 2008                      1,000,000.00                          948,964.12
  HEALTH CENTER INCL. CONCRETING      
  OF DRIVEWAY AND FENCING      
  QUEZON HILL      
         
134 DEVELOPMENT OF SATELLITE MARKET LDF 2003, 2004, 2007                  38,200,000.00                      11,894,838.62
  MINES VIEW      
         
135 COMPLETION OF MINES VIEW LDF 2009                    12,000,000.00                      11,894,838.62
  SATELLITE MARKET      
  MINES VIEW      
         
136 CONTINUATION OF CONSTRUCTION LDF 2009                          100,000.00                            97,881.00
  OF SENIOR CITIZEN'S CENTER      
  SLAUGHTER COMPOUND      
         
137 IMPROVEMENT OF BARANGAY BARANGAY FUND                          100,000.00                            99,597.20
  MULTI-PURPOSE HALL      
  EAST QUIRINO HILL      
         
138 REPAIR/RESTORATION OF THE CITY FOR FUNDING                        220,795.54                            219,135.60
  MARKET SUPT. OFFICE      
  CITY MARKET      
         
139 ADDITIONAL SCHOOL BUILDING LDF 2007                      2,000,000.00                      1,969,336.89
  CAMP 7      
         
140 DEVELOPMENT/CONSTRUCTION OF BRGY & SK FUND                        560,800.00                            560,800.00
  MULTI-PURPOSE HALL      
  HOLY GHOST EXT.      
         
141 FENCING OF VETERAN'S MEMORIAL LDF 2009                        200,000.00                          199,000.00
  PARK      
  HARRISON      
         
142 EXTENSION OF BAGUIO CITY FIRE CAPITAL OUTLAY                        425,000.00                      3,935,000.00
  STATION      
  @ KAYANG EXT.      
         
143 CONTINUATION OF THE IMPROVEMENT BRGY IRA                          197,200.00                            191,000.00
  OF MULTI-PURPOSE BUILDING      
  @ LEONILA HILL      
         
144 REHABILITATION OF THE OLD BRGY HALL CITY ORD 36 S. 2008                          100,000.00                            99,870.00
  TO BE USED AS BRGY HEALTH CENTER,      
  SENIOR CITIZEN'S HALL & BRGY TANOD      
  OUTPOST      
  @ VICTORIA VILLAGE      
         
145 IMPROVEMENT/EXPANSION OF BRGY LDF 2007                      1,000,000.00                          974,000.00
  HALL      
  @ SOUTH SANITARY CAMP      
         
146 EXPANSION OF PACDAL HEALTH CENTER CAPITAL OUTLAY                      1,500,000.00                        1,460,166.02
  PACDAL      
         
147 SLABBING/ROOFING OF THE BCJ ALLEY CAPITAL OUTLAY                        300,000.00                          205,337.78
  GOING TO THE SUPPLY ROOM & FEMALE ROOM      
  BAGUIO CITY JAIL      
         
148 CONSTRUCTION OF WATER TANKS @ LDF 2008                          100,000.00                            64,600.00
  PUROK IV-A (near Piling Cayat Residende)       
  LUCNAB      
         
149 CONSTRUCTION OF CANOPIES @ CAPITAL OUTLAY                        200,000.00                          175,568.86
  BAGUIO CITY JAIL FEMALE DORM      
  BAGUIO CITY JAIL      
         
150 CONSTRUCTION OF HEALTH CENTER @ PUROK 6 LDF 2008                          150,000.00                          145,377.92
  , GIBRALTAR      
         
151 IMPROVEMENT OF BARANGAY HALL @ LDF 2009                          100,000.00                            94,679.02
  BALACBAC,      
  STO TOMAS      
         
152 REPAINTING OF BARANGAY HALL LDF 2009 & 2011                          130,000.00                            117,710.37
  & TILING OF DAY CARE CENTER      
  GREENWATER VILLAGE      
         
TOTAL AMOUNT APPROPRIATIONS FOR IMPLEMENTED PROJECTS P 178,237,643.91
TOTAL CONTRACT AMOUNT FOR IMPLEMENTED PROJECTS P 120,607,359.88
TOTAL SAVINGS P    57,630,284.03
TOTAL # OF IMPLEMENTED PROJECTS 152
LIST OF ON-GOING VERTICAL INFRASTRUCTURE PROJECTS
NO PROJECTS SOURCE OF FUNDS APPROPRIATION CONTRACT
        PRICE
1 RENOVATION OF PUBLIC TOILETS @ CITY HALL CAPITAL OUTLAY                      3,600,000.00                      3,483,779.51
2 IMPROVEMENT OF BAYAN PARK (FITNESS TRAIL) CAPITAL OUTLAY                      1,500,000.00                      1,434,866.94
3 REPAINTING OF OFFICE BUILDING INTERIOR & EXTERIOR CIVIL REGISTRY MOOE 811                        250,000.00                          214,552.80
4 RENOVATION OF MULTI-PURPOSE HALL @ BCPO CAPITAL OUTLAY                      1,500,000.00                            921,211.40
5 CONSTRUCTION OF SENIOR CITIZEN BUILDING @ UPPER QUEZON HILL LDF 2011                        800,000.00                          763,750.61
6 REAPAIR OF BSTP DRYING BED GUTTERS @ SANITARY CAMP LDF 2009                      1,500,000.00                        1,412,524.05
7 REHABILITATION OF SILUNGAN CENTER @ OCSWADO CONTINUING FUND 2006                      2,000,000.00                        1,591,168.64
8 COMPLETION OF AURORA HILL BAGUIO CITY SENIOR CITIZEN'S MULTI-PURPOSE BUILDING @ BAYAN PARK AIP 2009                                                                 AIP 2010                                                             SARO                      1,675,000.00                        1,415,982.86
9 RENOVATION OF FIRING RANGE @ BCPO CAPITAL OUTLAY                      1,500,000.00                      1,493,793.99
10 IMRPOVEMENT OF SUPPLY OFFICE @ BCPO CAPITAL OUTLAY                        500,000.00                          457,000.00
11 CONSTRUCTION OF MOBILE TICKETING BOOTH @ GOV. PACK RD CAPITAL OUTLAY                        439,000.00                          439,000.00
12 IMPROVEMENT OF BASKETBALL COURT @ GABRIELLA SILANG LDF 2007                                                     CITY ORD 81 S. 2008                        500,000.00                          460,767.88
13 REPAIR OF OFFICE BUILDING @ CITY LIBRARY MOOE 2010                      1,000,000.00                          994,193.20
14 CONSTRUCTION OF AURORA HILL SUB-STATION @ BAYAN PARK, AURORA HILL CAPITAL OUTLAY                      9,000,000.00                      7,648,166.40
15 CONTINUATION OF THE REHABILITATION OF THE BARANGAY HALL @ UPPER GENERAL LUNA BRGY FUND 2010 & 2011                        409,433.00                          368,000.00
16 IMPROVEMENT OF SOLID WASTE MANAGEMENT BUILDING @ NEW LUCBAN CAPITAL OUTLAY                      2,300,000.00                      2,289,439.55
17 PROPOSED AMPITHEATER (Phase I & II) @ BAGUIO CENTENNIAL PARK PTA FUND /                                               ACCT CODE 252-2008-6                      7,634,705.82                      6,374,439.92
18 IMPROVEMENT OF MULTI-PURPOSE HALL @ MIDDLE QUIRINO HILL BRGY FUND 2010                          117,790.00                            114,674.00
19 REHABILITATION OF BLOCK 4 BAGUIO CITY MARKET CAPITAL OUTLAY                  26,000,000.00                      18,818,087.91
20 CONSTRUCTION OF COMFORT ROOM @ HAPPY HOLLOW ELEMENTARY SCHOOL AIP 2008                            70,000.00                            69,450.00
21 CONSTRUCTION OF COMFORT ROOM WITH WATER TANK (Phase I) @ KADACLAN VILLAGE, LOAKAN-APUGAN AIP 2009                            50,000.00                            49,250.00
22 IMPROVEMENT OF BARANGAY OUTPOST @ PUROK 6, GIBRALTAR LDF 2010                          100,000.00                            99,054.48
23 CONSTRUCTION OF KAYANG-HILLTOP BARANGAY HALL LDF 2009                        200,000.00                          190,243.75
24 REPAINTING OF OFFICE BUILDING @ THE LOCAL CIVIL REGISTRAR (contiguous) MOOD 811                            89,397.20                            89,397.20
TOTAL AMOUNT APPROPRIATIONS FOR ON-GOING PROJECTS P    62,735,326.02
TOTAL CONTRACT AMOUNT FOR ON-GOING PROJECTS P    51,192,795.09
TOTAL SAVINGS P    11,542,530.93
TOTAL # OF ON-GOING PROJECTS 24
LIST OF PROJECTS TO BE IMPLEMENTED PENDING ACTION FROM BAC
(SUBMITTED TO BAC FOR BIDDING)
NO PROJECTS SOURCE OF FUNDS APPROPRIATION AAE
         
1 CONSTRUCTION OF SENIOR CITIZEN SK TRAINING CENTER MULTI-PURPOSE BLDG @ BAKAKENG CENTRAL BRGY IRA                          703,310.00                          703,310.00
2 SCREENING OF DAY CARE CENTER WINDOWS @ COUNTRY CLUB VILLAGE LDF 2011                            65,000.00                            57,693.73
3 CONSTRUCTION OF SENIOR CITIZEN'S CENTER @ STO NINO BRGY SLAUGHTER COMPOUND LDF 2009                          100,000.00                            98,898.62
4 INSTALLATION OF TILES OF THE DAY CARE CENTER CR @ GREENWATER VILLAGE LDF 2011                            30,000.00                              13,217.10
5 CONSTRUCTION OF WAITING SHED @ PUROK 3 @ HAPPY HOLLOW LDF 2010                          100,000.00                          100,000.00
6 IMPROVEMENT OF BRGY HALL @ EAST BAYAN PARK BRGY FUND                            80,284.00                            80,284.00
7 IMPROVEMENT OF BRGY HALL @ UPPER DAGSIAN BRGY IRA                          170,000.00                          170,000.00
8 CONSTRUCTION OF CATWALK & RESTORATION OF GUTTERS @ BRGY OFFICE, MIDDLE QUEZON HILL BRGY IRA                          147,102.72                            147,102.72
9 REHABILITATION OF COMFORT ROOM @ THE FLEE MARKET, SLAUGHTER COMPOUND BARANGAY IRA 2009-2010                        270,000.00                          270,000.00
10 IMPROVEMENT OF HEALTH CENTER @ PUROK 6, GIBRALTAR LDF 2008                          150,000.00                          150,000.00
11 IMPROVEMENT OF DAY CARE CENTER @ GUISAD CENTRAL BARANGAY FUND                      80,072.8396                            80,072.84
12 CONSTRUCTION OF CRIME LABORATORY BUILDING @ KAYANG STREEET ACCOUNT NO. 211                      3,000,000.00                      2,955,000.00
13 PARTIAL REHABILITATION OF HERITAGE HILL BUILDING FORMER DIPLOMAT HOTEL ON THE EAST WING TO BE CALLED PRAYER CENTER @ DOMINICAN H ILL LDF 2009-2010                      2,490,000.00                        2,246,122.19
14 IMPROVEMENT OF BRGY OUTPOST @ UPPER MARKET LDF 2011                    100,000.0000                          100,000.00
15 CHILDREN'S MINI-PARK IMPROVEMENT @ IMELDA MARCOS BRGY LDF 2005                            50,000.00                          100,000.00
16 PROPOSED REPAIRS @ Swimming Pool Complex for funding                    11,440,000.00                      11,440,000.00
17 REPAIR OF PEOPLE'S PARK MOOE                        540,000.00                          540,000.00
18 REHABILITATION OF OLD BARANGAY HALL @ VICOTIRA VILLAGE LDF 2009                            50,000.00                            50,000.00
19 CONSTRUCTION OF BARANGAY SATELLITE MARKET LEONILA HILL BRGY IRA 2011                        209,836.00                          209,836.00
20 REPAIR/REPLACEMENT OF BRGY HALL & WAITING SHED GUTTERS/EXTENSION OF BRGY HALL SOUTH DRIVE BRGY IRA 2009                          102,913.00                            102,913.00
21 CONTINUATION OF THE IMPROVEMENT OF BARANGAY HALL @ LEONILA HILL BRGY IRA                          197,200.00                          197,200.00
22 FENCING OF THE DAY CARE & REHABILITATION OF THE WAITING SHED @ PUROK II VICTORIA VILLAGE CITY ORD. 3 S. 2011                            75,000.00                            75,000.00
23 IMPROVEMENT OF TANOD OUTPOST @ GUISAD CENTRAL BRGY IRA 2010                            66,668.80                            66,668.80
24 IMPROVEMENT OF MULTI-PURPOSE @ PUROK 6 GIBRALTAR LDF 2010 SUP BUDGET                        256,000.00                          134,045.49
25 PROPOSED EARLY WARNING DEVICE @ City Hall Pedestrian Overpass for funding                        260,753.95                          260,753.95
26 PROPOSED MEMORABILIA SHOWCASE @ CITY HALL PHISTA BCC FUND                          123,292.20                          123,292.20
27 CONTINUATION OF CONSTRUCTION OF JOINT BARANGAY HALL @ FERDINAND & IMELDA BRGY BRGY FUND                        250,000.00                          248,376.35
28 REPAINTING OF BARANGAY HALL @ ABCR BRGY BRGY IRA 2009                          150,000.00                          139,503.34
29 CONSTRUCTION OF PUROK III WAITING SHED @ IRISAN SK 2011                            70,000.00                            70,000.00
30 CONSTRUCTION OF WAITING SHED @ PUROK 6 @ GIBRALTAR BRGY IRA 2011                            74,000.00                            74,000.00
31 IMPROVEMENT OF BARANGAY HALL @ FIL-AM BRGY BRGY IRA                          137,035.00                            123,151.84
32 ESTABLISHMENT OF A FUNCTIONAL READING CENTER @ HAPPY HOLLOW BRGY FUND 2010                          100,000.00                          100,000.00
33 CONSTRUCTION OF MULTI-PURPOSE HALL & TRAINING CENTER @ STO NINO CMPD BRGY IRA 2011                          221,137.00                            221,137.00
34 IMPROVEMENT OF ONE-STOP SHOP @ Treasury, CITY HALL for funding                          878,621.40                          878,621.40
35 CONSTRUCTION OF BRGY HALL @ SOUTH CENTRAL AURORA HILL LDF 2010                          150,000.00                          150,000.00
36 PROPOSED COVERD COURT @ MAGSAYSAY NAT'L HIGH SCHOOL NEW LUCBAN for funding                      2,010,042.00                      2,010,042.00
37 COMPLETION OF LUCBAN HEALTH CENTER (Phase II) NEW LUCBAN 2006 CAPITAL OUTLAY (savings from Phase I)                      1,800,000.00                          282,528.60
38 IMPROVEMENT OF BRGY REST ROOM & BRGY HALL FLOORING @ DPS COMPOUND 2010 SUPP BUDGET                            50,000.00                            50,000.00
39 RENOVATION & EXTENSION OF BALACBAC WOMEN'S MULTI-PURPOSE CENTER @ STO TOMAS PROPER LDF 2009                          100,000.00                            81,737.25
40 CONSTRUCTION OF MEZZANINE FLOOR @ CITY TREASURER'S OFFICE, CITY HALL for funding                        652,044.74                          652,044.74
NO PROJECTS SOURCE OF FUNDS APPROPRIATION AAE
         
41 BAGUIO CITY FIRE STATION COMPLETION @ KAYANG EXT AIP 2011                      2,000,000.00                      2,000,000.00
42 REPAIR OF BAGUIO CITY FIRE STATION @ KAYANG EXT                          1,125,000.00                        1,125,000.00
43 CONSTRUCTION OF SOCIAL WELFARE MULTI-PURPOSE BUILDING UPPER SESSION RD CAPITAL OUTLAY 2003                    10,000,000.00                      9,880,000.00
44 REHABILITATION OF ORCHIDARIUM BUILDING FOR GARDEN WORKS DISPLAY CAPITAL OUTLAY                      1,000,000.00                      1,000,000.00
45 REHABILITATION/REPAIR OF THE BATHROOM @ SAN ANTONIO VILLAGE BRGY 2011                            72,283.10                            72,283.10
46 CONTINUATION OF THE CONSTRUCTION OF KIAS ELEMENTARY SCHOOL BUILDING BRGY FUND 2010                        407,924.00                          407,924.00
47 RENOVATION OF STAGE BASKETBALL COURT @ BAYAN PARK, AURORA HILL LDF 2011                          100,000.00                          100,000.00
48 CONSTRUCTION OF BULLETIN BOARDS FOR 6 PUROKS @ EAST MODERNSITE LDF 2010                            50,000.00                            50,000.00
49 IMPROVEMENT/REHABILITATION OF BARANGAY HALL @ GEFA LOWER QM BRGY FUND 2011                          261,263.00                          252,466.39
                     42,516,783.75                      40,440,226.65
TOTAL AMOUNT APPROPRIATIONS FOR ON-GOING PROJECTS P    42,516,783.75
TOTAL CONTRACT AMOUNT FOR ON-GOING PROJECTS P    40,440,226.65
TOTAL SAVINGS P        2,076,557.10
TOTAL NUMBER OF PROJECTS TO BE IMPLEMENTED              49
Prepared by:
Maria Lourdes T. Danganan
Draftsman II
Noted: 
Nazita F. Banez
Engineer IV
 
Search News
ADVISORY

STATE OF THE CITY ADDRESS 2017

STATEMENT IN REPLY TO THE PUBLISHED OPEN LETTER OF BCDA PRESIDENT and CEO ARNEL PACIANO D. CASANOVA

STATE OF THE CITY ADDRESS
2014

Speech Delivered by Mayor Mauricio G. Domogan during the Cordillera Month Closing Ceremony
July 26 SLU-BC

sora

STATE OF THE REGION ADDRESS

1st100

Click on the City's Programs and Projects Menus for the 1ST State of the City Address

mayors_project

Click on the City's Programs and Projects Menus for the complete list

house

draft

Autonomy Working Draft is also in the Legislative Directory

herald_express_mayor